The design is suitable for the specific requirements of the factory, meeting 100% of the requirements from the factory operator.
Always complete ahead and on time the very urgent implementation milestones of the entire project
PROJECT INFO
With a scale of 280 hectares, Hoa Phat Dung Quat 2 Iron and Steel Production Complex has a total investment capital of 85,000 billion VND, design capacity of 5.6 million tons of high quality hot rolled coil (HRC) steel/year.
In this phase 2, the complex has 1 110KV power station, 1 thermal power plant, over 7 35KV stations and many 10KV stations.
Project scale
Song Nam is the subcontractor in charge of designing and then configuring the entire industrial network system according to IEC 61850 standards and design/implementation recommendations from Cisco for power stations and power plants in the project. .
All smart electrical equipment in power stations are connected to the OT network using PRP, VRRP, OSPF, NTP protocols combined with VLAN planning to secure, separate real-time control traffic, and monitor traffic. 1:1 monitoring and backup according to internal operating requirements and connection to A3, PCQ and OT center